Σ TVL:√–|24H VOL:√–|CAPERS:–
LAUNCHGOVERN
$LOAD04
HomeAll capersCaper home
MANIFESTO · CAPER / OWN THE GAME
An organization that raises and deploys its own capital. A market that never closes. Governance that can't be captured.
TermsPrivacyFollow @caper_network on X

History – About

Back
v2.0.0 · currentSet the two options side by side and added payouts and the proposal timelineaccount_...wggt11d
7 blocks added
  • Added – Text at Block 3

    What did $LOAD04 spend its treasury on? A 90 $XRD invoice. “ Spend it, or park it in a sibling caper (/capers/LOAD04/proposals/P-LOAD04-CB627C) ” put two uses of the same treasury against “Do nothing”: invest 120 $XRD in $LOAD02 (/capers/LOAD02) , or pay a 90 $XRD invoice. 36 ballots ranked the invoice first, the market window ratified it, and the 90 $XRD went to the drill’s deployer wallet.

  • Added – Text at Block 4 → Column 1 → Block 1

    Invest 120 $XRD in $LOAD02 Buy $LOAD02 on its curve with treasury $XRD, keeping the value on the balance sheet as a position in another caper. Not chosen.

  • Added – Text at Block 4 → Column 2 → Block 1

    Pay the 90 $XRD invoice Withdraw 90 $XRD from the treasury and deposit it with the invoicing account. Chosen and executed in this transaction (https://stokenet.radxplorer.com/transactions/txid_tdx_2_158ln66epgh6mhpcdare3663ej52h848estxvueuaqhnnz5upccvqasa8dl) .

  • Added – Text at Block 5

    Payouts

  • Added – Grants ledger at Block 6
  • Added – Text at Block 7

    Proposals

  • Added – Timeline at Block 8
v1.0.0Createdaccount_...wggt11d
2 blocks added
  • Added – Text at Block 1 → Block 1

    Cashtag $LOAD04 Network Stokenet, Radix’s public test network Launched 11 October 2026, by the load drill Drill role Curve and treasury exercise Proposal “ Spend it, or park it in a sibling caper (/capers/LOAD04/proposals/P-LOAD04-CB627C) ” Outcome Executed: paid the 90 $XRD invoice

  • Added – Text at Block 2

    Load Drill 04 ($LOAD04) is a synthetic caper on Stokenet, Radix’s public test network. The load drill, a script that runs after every redeploy of Caper’s contracts, launched it on 11 October 2026 to exercise the bonding curve and the treasury. Wallets the drill controls hold its tokens, and it is not a real organization.